LAURENTIEN
LOG HOMES LTD. Materials list |
Included in Kit Log & Beam Kit = L
Standard Kit = X + L
Camplex Kit = X + w + L
1 Building plans and specifications L 2 Have electrical plan done 2 PERMITS, LICENSES, LEGAL, SOIL TESTS 3 Footings & foundation walls 3 French drains 3 Gutter drains, connectors and temporary pipe plugs 3 Basement floor drains 3 Basement Wall tar 3 Basement floor gravel or crushed stone 3 Geo-Textile to cover crushed stone 3 Crushed stone for French drains 5 Log Plans L 6 Basement posts under girders (steel plates & adjustment mech) 6 Girder Beams 19 Basement stairs 22 Polyethylene under basement slab 23 Basement Cement Floor MAIN FLOOR 7 joist bands 7 joist headers 7 joists 7 double joists 7 bridging 7 stairway Headers & doubles 7 floor Sheathing 7 joist Hangers, doubles and singles 7 3.5" & 2" nails & gun nails 7 joint sealant - sill seal 21 insulation of the floor perimeter 26 floor finishing 25 ceiling finishing 8 LOG WALLS & BEAMS L 8 joint sealant (1 tube tar for every 12' of perimeter) L 8 logs (with log plans & electrical plan by owner) L 8 girder beams L 8 2nd floor beams L 8 center posts L 8 post adjustment mechanism L 8 metal connectors L 8 (nails, lag screws, olly log, lock tite, metal plates, L 8 washer, nuts, threaded rods, tension springs, hangers) L 9 straw, 1 pack of pink fiberglass & see log installation lists 9 Temporary entrance walkway 9 2x4 bracing and scaffold material GABLES & KNEEWALLS (8) 10 Exterior finish (log siding if stipulated on agreement) L 8 exterior furring x 8 black paper x 8 sheathing x 8 stud structure x 8 jack studs x 8 headers & sub sills x 8 blocking x 8 wall plates x 8 triple studs to support beams x 8 temporary bracing 2x4's 8 hurricane holdowns x 8 finishing and structural nails 10 gable vents w 17 insulation & sill seal 17 interior furring 17 vapor barrier 25 interior finishing or gypsum contract ROOF (10) 8 roof beams x 10 roof rafters or trusses x 10 roof rafter fillers x 10 tail rafters x 10 false roof rafters x 10 structural fascia x 10 ceiling joists x 10 lookouts or blocking for rakes x 10 soffit structure x 10 hangers or hurricane holdowns x 10 sheathing x 10 H-clips x 10 2" nails & 3.5" nails 10 hurricane tie downs x 10 rafter collar ties x 10 bracing x 11 aluminum edge starter w 11 starter shingles w 11 roof finishing (asphalt, tin, tiles) w 11 roof flashing w 11 tar 24 soffit vent strips w 24 soffit finish w 24 soffit moldings w 17 insulation 17 furring 17 vapor barrier 17 free flow vents 24 ceiling finish - t&g pine or (gypsum generally by sub trade) Roof ridge vent material (11) 10 2x3 rafters x 10 16 " sheathing strips x 11 vent strips w 11 aluminum edge starter w 11 asphalt starter w ROOF (10) continued 12 roof fascia w 10 assorted nails 10 Dog House Dormers, Shed Dormers, Special Dormers x 10 see roof materials and gable lists 10 Special Roof Canopies over entranceways or windows x 10 Roofs over sun rooms or carports x 10 hurricane tie downs w 13 gutters and downspouts 14 Windows & Doors (14) x 9 w&d 2x2 re-enforcing x 9 w&d angle iron stiffeners x 10 Velux roof windows 14 installation screws or nails 14 shims 14 metal straps to hold 2x2's in place x 14 Weather stripping for doors x 15 Exterior frame extension moldings for 8x8 log x 16 Interior frame extension moldings for all log types x 16 interior facers 16 exterior facers w 16 air stop barrier w 16 caulking w 16 foam & insulation 16 Window sills interior and exterior 16 Moldings under interior & exterior sills (optional) w 16 Flashing over top w 16 Doors pre-hanging x 16 Screens x 16 Stain, paint or preservative CONVENTIONAL EXTERIOR WALLS #8 for 2nd level 8 exterior furring x 8 black paper or wind stop x 8 structural nails 8 sheathing x 8 stud structure x 8 headers, jack studs, wall plates, blocking x 8 tripled studs to support girders x 8 hurricane tie downs x 12 exterior finish x 17 insulation 17 interior furring 17 vapor barrier 17 interior sheathing 25 gypsum 25 T&G pine interior finish or gypsum 2ND FLOOR (8) 8 2nd floor sheathing w 8 2nd floor joists (usually 2x4) w 8 2nd floor rim joists and headers w 8 2nd floor blocking w 8 2nd floor heating runways w 8 2nd floor furring on top of beam joists (optional) w 8 2nd floor beam joists x 8 2nd floor girder beams x 8 support posts for 2nd floor girders x 8 adjustment mechanisms under posts 2nd floor x 20 1st floor ceiling furring 25 1st floor ceiling finishing 25 2nd floor acoustic insulation (optional) INTERIOR FINISHING (20) 20 partition studs w 20 6" nails & washers to attach studs to ceiling and log walls 20 partition plates w 20 adjustable screw posts for inside partitions x 20 partition blocking & bracing w 20 exhaust fan piping and ports 25 partition insulation 25 partition finishing 29 partition ceiling moldings 29 floor moldings & corner moldings 29 chair rail moldings for wainscoting INTERIOR STAIRS (28) 28 steps w 28 stringers w 28 risers w 30 handrails, balusters & newel posts 30 INTERIOR BALCONY RAILS INTERIOR DOORS (29) 21 pocket door hardware 29 doors & frames 29 handles & hinges 29 facers 29 Log or frame fillers CLOSETS (29) 29 closet poles 29 closet shelves 29 closet doors 29 closet facers 29 closet door hinges or rails 29 closet handles & locks 29 closet built-ins 29 closet moldings PORCHES, BALCONIES AND DECKS (6) 6 footing pads 6 cement columns 6 sonotube forms 6 treated posts 7 girder beams 7 joists 7 headers 7 hangers 7 sills 7 cement anchors 7 decking 8 posts & bands x 8 beam rafters if applicable (optional) x 10 ceiling joists x 10 structural fascia x 10 furring 10 sheathing x 10 ceiling finish w 10 ventilators w 11 all roofing materials included above w EXTERIOR MOLDINGS (10) 10 soffits w 10 corners of dormers w 10 base of house 10 between house and deck 10 between gable lower wall structure EXTERIOR STAIRS AND RAILS (24) 24 rails 24 balusters 24 posts 24 bolts 24 steps 24 stringers 24 footing pad under stairs 10 ELECTRICAL ENTRY 7 WATER CONNECTIONS OR WELL 7 SEWAGE CONNECTIONS OR SEPTIC SYSTEM 10 NAILS, SHIMS & OTHER INCIDENTALS 11 ROOFING CONTRACT 13 RAIN GUTTERS 14 GARAGE DOOR SET (when applicable) 21 ELECTRIC ROUGH WIRING 21 PLUMBING ROUGH 15 INTERIOR STAIN 19 INSULATION CONTRACT 21 DELIVER BATHTUBS AND SHOWERS 22 CHIMNEY 25 SOUND INSULATION 25 MATERIAL FOR ATTIC DOOR ACCESS 25 MAIN FLOOR SANDING 25 SECOND FLOOR SANDING 25 CAULKING CONTRACT 26 WOOD FLOORING 28 FLOOR SCREWS OR GLUE 29 ALARM SYSTEM 30 WOOD STOVE INSTALLATION 30 TILES INSTALLATION CONTRACT 31 INTERIOR CLEAR FINISH 32 EXTERIOR STAIN 32 Wood Floor Urethane application 33 BATHROOM EXHAUST FANS 33 KITCHEN EXHAUST FAN 33 DRYER VENT 33 KITCHEN STOVE VENT 35 KITCHEN CABINETS 35 BATHROOM VANITIES 35 BATHROOM PHARMACIES 35 MIRRORS 36 SPECIAL SHELVING UNITS 40 PLUMBING FINISHING 41 ELECTRICAL FIXTURES 45 OTHER TYPES OF FLOOR COVERING 22&40 HEATING (Must be forced air for residences) 22&40 AIR CONDITIONING (optional) 22&41 AIR EXCHANGER (imperative) LANDSCAPING: 2 TREE CLEARING & BURNING
2 ENTRANCE ROAD STRUCTURE BEAMS PRESERVATIVE & STAIN FILL EARTH SEED OR SOD 2 EXCAVATION 7 BACKFILL GRAVEL TRANSPORT SUB TRADE LABOR STONE RETAINING WALLS TREE PLANTING 7 ENTRANCE ROAD & PARKING FINISHING 42 APPLIANCES LABOR Telephone :1.450.229.2933 - Postal address : 5636 Rte 117, Val Morin, Québec J0T2R0